OMEGA Planning Guide Part No. 000822, 31-m07-2014
Site verification
Stairway
Due to close running clearances, the Owner/Agent must ensure that the stairs (where provided)
are level, plumb (+/-1/8” (3 mm)) and square and are in accordance with the dimensions specified
on the site-specific plan drawings.
Minimum overhead clearance
The Owner/Agent must ensure the minimum overhead clearance is in compliance with codes.
Construction site
The Owner/Agent is responsible for all masonry, carpentry and drywall work as required, and for
patching and finishing (including painting) all areas where walls/floors may need to be cut, drilled
or altered in any way to permit the proper installation of the lift.
Dimensions
The Contractor/Customer must verify all dimensions on the site-specific plan drawings and report
any discrepancies to the Agent or Distributor.
Installation
The equipment must be installed by a qualified technician in compliance with the codes
identified on the front cover of this manual.
The conformity for access to the platform is the distributor’s responsibility.